Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; plgContentartcolorbox has a deprecated constructor in /home/public/sites/www.green-well-westland.nl/plugins/content/artcolorbox/artcolorbox.php on line 19

In October 2011 a start was made with the construction of the drilling site. The terrain of 6000 m2 is located on the Ockenburglaan te Honselersdijk located next to the company Zeurniet of Jos Scheffers. Preparing the drill site involves the construction of a liquid tight floor with a containment system for any salt water or hydrocarbons which is released during the drilling operations. The work was performed by contractor Kroes B.V.

Four silos are build for collecting water from the well during the test period and the supply of water for the drilling fluid.
Kroes

Impressie na de boring

Impressie na de boring